TechCom was contracted to install a new low flow outlet at the base of the Morris Dam, 30 miles east of Los Angeles. As part of this project, we also completed installation of a floating dock and rail system, repairs to the dam structural concrete, new security gate system and removal and restoration of a 20-ton caterpillar gate and hoist system.
Contact us to learn more or email techcominfo@bhienergy.com.