Water Storage Tank Exterior Recoating

BHI completed an 8,000 sq ft recoating project for a SE utility of  their 25 foot tall by 60 foot wide water storage tanks.  The project included building scaffolding and tenting in preparation for the pressure washing and abrasive blasting required to prepare the surface.  After performing base metal inspections and repairs, the entire tank was metalized with TSA and sealed with a two coat system.  Overall duration was 13 weeks with 2 metalizing teams.