Tritium Mitigation Turbine Building Floor Coating Project Entergy

BHI supported the Entergy River Bend Station’s Tritium Mitigation Project by resurfacing and coating the entire Turbine Building Floor with a 100% solids F601 and S301 Mastic epoxy system. The flooring system was designed to create a monolithic barrier preventing water migration through the concrete. The project scope included stripping and recoating 37,000 square feet of floor space while the 1080Mw BWR was on-line.