Fermi

Site Information

The Fermi 2 Power Plant is located 36 miles southwest of Detroit, Michigan and 30 miles north of Toledo, OH.

The site is owned and operated by Detroit Edison.  The unit began commercial operation in 1988 and generates 1,170 MW.

Key Contact Information

BHI Site Manager: Name: Rebecca (Becky) Mclaughlin
(734) 586-4924,  rebecca.mclaughlin@dteenergy.com

Recruiter: Joey Melanson
800-225-0385 X1272, joey.melanson@bhienergy.com

BHI Director: Frederick Campbell, (774)283-3711, Fred.campbell@bhienergy.com

Reporting Information

Welcome to the Fermi outage. Please report to the GTOC  at 0700 on your assigned report date and remember to bring a current ID.  The GTOC is located on the left side of the access road after going thru the main gate.  You will be inside the Fermi Owner Controlled Area so you or your vehicle are subject to search at any time.  Make sure there is no contraband in your vehicle or on your person.

No Guns, Ammo, Knives, Alcohol (including empty containers) or drugs.  If you have to ask if it’s contraband, it probably is and don’t bring it on site!

A BHI representative will meet you to complete in-processing paperwork and give you your Training Schedule.

GPS Address

5998 Enrico Fermi Dr #5796, Newport, MI 48166

Directions/Link to Google Maps

Fermi Google Map

Directions:
From I-75 in Monroe, MI take Exit 15, Dixie Highway and head north for about 5 miles to Enrico Fermi Drive.

Nearest Airports

Detroit Metropolitan Airport (DTW) 20.6 miles

Toledo Express Airport (TOL) 31.1 miles

Preferred Places to Stay

Hotels near Fermi Google Map

 

Monroe

Hampton Inn
Monroe, MI
734-289-5700

Red Roof Inn
Monroe, MI
734-289-2330

Motel 6
Monroe, MI 734-289-2000

Knights Inn
Monroe, MI
734-243-0597

Americas Best Value Inn
Monroe, MI
734-289-1080

Quality Inn
Monroe, MI
734-242-6000

Baymont Inn
Monroe, MI
734-384-1600

Comfort Inn
Monroe, MI
734-384-1500

Hotel Sterling
Monroe, MI
734-242-6212

Del Rio Apartments (furnished)
Monroe, MI
734-242-6026
RV/Campgrounds

Camp Lord Willing
877-210-8700
www.camplordwillingmanagement.com

Harbortown RV Resort
734-384-4700
www.harbortownrv.com

January
14

Fermi COVID-19 Testing Policy as of 1-14-2022

by varesha mauney on 1/14/2022 03:18 PM

All BHI employees, regardless of vaccination status, who are assigned to the Fermi Unit 2 power plant outage will be required to comply with this COVID-19 policy for testing.

  • BHI personnel must have an FDA-approved rapid antigen test administered, regardless of vaccination status, no earlier than five days prior to their report date. This test must be performed by a qualified healthcare provider or can be performed using a “proctored” method. During the proctored method the test must be observed in real time by a telehealth provider or by a BHI designate competent person using live streaming video conference. The results must show as a “negative” for COVID-19 before reporting to the Fermi site.

2)    Once on site, a COVID-19 test must be administered or proctored by the BHI Representative at least once every seven days.

If an employee does not provide documentation of a COVID-19 test result as required by this policy, they will not be allowed to report to the Fermi Unit 2 workplace until they provide a test result.